Napa Valley Wine Train

Military & Federal Projects

Napa Valley Wine Train
Napa, CA
Design Build

The Napa Valley Wine Train Railroad relocation project is a site underground project which consists of installing over 30,000 linear feet of underground infrastructure parallel with the Railroad tracks. Our in-house engineer / design build team provides composite drawings coordinating all underground utilities and or infrastructures for this project. Underground infrastructures that follow the railroad tracks include the Napa Railroad conduits, AT&T and Comcast Conduits. Underground infrastructures at the street crossings include the AT&T and Comcast conduits. New and upgraded parking lot and street lighting was installed at 1st and 3rd street, on the new dry bridge, and in the Napa Valley Wine Train Parking Lot. Existing vaults and pull boxes had to be raised to the new grade level.